Services Rendered
Supervision work for the construction of airplane terminals and land roads at the front level of the passenger terminal in the following areas
- The construction of the airplane terminals secondary building 1 (B2 floor, B1 floor and G floor), the secondary satellite terminal building 1 and southern connection tunnel (Structural work and main system work)
- The construction of the secondary satellite terminal building 1 (2nd floor - 4th floor) and the tunnel connecting the south (subsystem work)
- The construction of the extension of the east passenger terminal, airline office building and east side parking
- Utility system construction
- Procurement work and installation of the Automated People Mover System (APM)
- Procurement work and installation of baggage handing system (BHS) and explosive detection system (EDS)