TESCO LTD.
  • HOME
  • ABOUT US
  • SERVICES
  • OUR WORKS
  • OUR CUSTOMERS
  • PRESS RELEASE
  • CAREERS
  • CONTACT US
  • TH
  • EN

Tesco Consultants

OUR WORKS

  1. OUR WORKS
  2. Construction Supervision of BLUE Line: Hua Lamphong-Bang Khae and Tao Pun-Tha Pra Section

Construction Supervision of BLUE Line: Hua Lamphong-Bang Khae and Tao Pun-Tha Pra Section

19 Nov. 2020
1529 views
Construction Supervision of BLUE Line:  Hua Lamphong-Bang Khae and Tao Pun-Tha Pra Section
INFORMATION
Location
Bangkok
Owner
Mass Rapid Tans Authority of Thailand
Project Cost
71,649,000,000 Baht
Project Period
17 February 2011 – 6 October 2016

Services Rendered

Construction supervision, elevated and underground railroad work, station building, maintenance center building bridge over the river and the Chao Phraya river tunnel;

I) Metropolitan Electricity Authority

- Controlling the construction with Metropolitan Electricity Authority officials

- Demolition work of 24KV and 69KV electrical cables

- Inspect work near the high voltage transmission line with the Metropolitan Electricity Authority officials.

II) Telecommunicate

Construction supervision with the staff of the telecommunication unit, including

- Construction of underground conduit, Manhole installation, Pullbox, PVC pipe installation, Horizontal Directional Drill, 125 mm., Riser Pole, Road surface return

- Relocation of Copper Cable and Optical Fiber Cable

Share Tweet
PRINT

Related services

Transportation Infrastructure
01
Special Project
02
Construction Management&Supervision
03
Architecture
04
Environmental Impact Assessment (EIA)
05
TESCO LTD.
SITE MAP
  • HOME
  • ABOUT US
  • SERVICES
  • OUR WORKS
  • OUR CUSTOMERS
  • PRESS RELEASE
  • CAREERS
  • CONTACT US
Copyright © 2020 TESCO LTD. ALL RIGHTS RESERVED.
FOLLOW US:
Modal title
...
Modal title
...

pg สล็อต เว็บตรง

pg สล็อต

สล็อตเว็บตรง

สล็อตเว็บตรง

สล็อตเว็บตรง

สล็อตเว็บตรง

สล็อตเว็บตรง

สล็อตเว็บตรง

การพนันออนไลน์

คาสิโนออนไลน์