Tesco Consultants

OUR WORKS

Construction Supervision of BLUE Line: Hua Lamphong-Bang Khae and Tao Pun-Tha Pra Section

19 Nov. 2020
902 views
INFORMATION
Location
Bangkok
Owner
Mass Rapid Tans Authority of Thailand
Project Cost
71,649,000,000 Baht
Project Period
17 February 2011 – 6 October 2016

Services Rendered

Construction supervision, elevated and underground railroad work, station building, maintenance center building bridge over the river and the Chao Phraya river tunnel;

I) Metropolitan Electricity Authority

- Controlling the construction with Metropolitan Electricity Authority officials

- Demolition work of 24KV and 69KV electrical cables

- Inspect work near the high voltage transmission line with the Metropolitan Electricity Authority officials.

II) Telecommunicate

Construction supervision with the staff of the telecommunication unit, including

- Construction of underground conduit, Manhole installation, Pullbox, PVC pipe installation, Horizontal Directional Drill, 125 mm., Riser Pole, Road surface return

- Relocation of Copper Cable and Optical Fiber Cable