Green Line BTS Project Morchit - Saphan Mai - Khu Khot Section

3 Dec. 2020
837 views
INFORMATION
Location
Bangkok
Owner
Krungthep Thanakom Co., Ltd.
Project Cost
218,000,000 Baht
Project Period
12 October 2017 – 1 July 2020

Description

-An elevated mass rapid transit project with a distance of 19 km.

- 16 train station buildings, 1 depot building, and 2 Park & Ride buildings.

The project route is elevated, continuing from the existing at Mo Chit Station running along Phaholyothin Junction and Kasetsart University, running to Lak Si Junction, running straight to Ying Charoen Market at Saphan Mai until passing Royal Thai Air Force Museum, then turns right crossing Khlong Song passing Khu Khot Police Station and running along the median of Lam Luk Ka Road and terminates at Khong Song (Khu Khot station).

Services Rendered

Installation of the vehicle system which consists of the following tasks

-Interface & coordination in civil work, rail system work, building assembly system work and vehicle work system work

-Signaling & train control system

-Power supply systems

-Fixed communications systems

-Automatic fare collection system

-Platform screen door system

-Control system and data storage system (SCADA System) Equipment and facilities in the deport and workshop facilities

-Railway system specific building services at station 

-Construction / renovation of civil work and railway system

-Care of Work

-Bulk Substation