Detailed design and prepare an environmental impact report for the construction of the Mae Sot-Tak-Kamphaeng Phet-Nakhon Sawan Railway Line

15 Feb. 2021
844 views
INFORMATION
Location
Mae Sot-Tak-Kamphaeng Phet-Nakhon Sawan
Owner
State Railway of Thailand
Project Period
15 October 2020 – 9 October 2021

Project description
- A total distance of 257 kilometers, divided into 2 parts
      Section 1 Nakhon Sawan - Kamphaeng Phet - Tak, with a distance of 188 km.
      Section 2 Tak - Mae Sot, a distance of 69 km.
- The railway structure at ground level, distance 204 km.
- The structure of the railway bridge, a distance of 22 km.
- Structure of the railway tunnel, distance 31 km.
- Number of stations 29 stations