Project description
- Elevated electric train with a distance of 1.5 km.
- There are 3 stations: Krung Thon Buri Station, Charoen Nakhon Station, and Khlong San Station
- Maintenance building (1 depot)
- Autonart Cuide Rail Transit system, driverless, 3 trains (2 carbinets / train)
Prepare documents and evaluate technical and pricing proposal to select contractors for the construction of the project to install the train system and operating and maintenance services.