Tesco Consultants

OUR WORKS

Golden Line Train: The project of the secondary mass transit system(Krung Thon Buri BTS Station - Khlong San District - Prajadhipok)

22 Feb. 2021
829 views
INFORMATION
Location
Bangkok
Owner
KrungThep Thanakom Co., Ltd.
Project Period
2 May 2017 – 15 June 2017

Project description

- Elevated electric train with a distance of 1.5 km.

- There are 3 stations: Krung Thon Buri Station, Charoen Nakhon Station, and Khlong San Station

- Maintenance building (1 depot)

- Autonart Cuide Rail Transit system, driverless, 3 trains (2 carbinets / train)

Scope of works

Prepare documents and evaluate technical and pricing proposal to select contractors for the construction of the project to install the train system and operating and maintenance services.