Description
Project are consist of 3 buildings
1.Paper machine building (PM#9) and warehouse part A (WH#9A) is a two storeys building for paper production and preliminary paper roll.
2.Waste paper plant (WP#9) for paper preparing and mixing before send to PM#9
3.Part B warehouse (WH#9B) for finish product storage
TESCO Involvement
Detail design of architectural and engineering drawing including sanitary work, fire fighting work. Providing drawing and tender document, construction supervision.