MRT extension projects and new lines, include 3 projects (Blue Line, Orange Line, Purple Line)

20 Sep. 2021
718 views
INFORMATION
Location
Bangkok
Owner
Mass Rapid Transit Authority of Thailand (MRTA)
Project Cost
234,000,000,000 Baht
Project Period
2005 – 2006

Project description

The mass transit system, both elevated and underground, 3 routes, Blue Line: the extension of Hua Lamphong - Bang Khae, and Bang Sue - Tha Phra section, Orange Line: Bang Kapi - Bang Bamru section and the Purple Line: Bang Sue - Rat Burana section. The total distance is about 71 km, consists of underground about 40 km. and elevated about 31 km.

 
Service scope
 
- Feasibility study,  environmental impact analysis and prepare a preliminary
- Feasibility study of the project
- Survey and topographic map, Lands map and Utilities map
- Survey in Geotechnical and Geological Engineering
- Route design
- Preliminary design 
- Prepare boundary and data for land ownership arrangements
- Prepare project implementation plans
- Design and preparation of tender documents
- Detailed Design and prepare tender documents for civil works and eleveted projects
- Prepare tender documents for electrical systems