Project description
Intercity Motorway between Cha-am - Chumphon. The total length is about 275 km. with 4 lanes.
Service scope
- Engineering Feasibility Study
- Economic and Social Feasibility Study
- Traffic and transport Feasibility Study
- Study of environmental impact and corrective/preventive measures
- Preliminary design of special highways and toll plazas
- Construction cost estimate
- Planning the project implementation