Small hydropower project - Mae Ngao Water Project

21 Sep. 2021
813 views
INFORMATION
Location
Sop Khong Subdistrict, Omkoi District, Chiang Mai Province
Owner
Department of Alternative Energy Development and Efficiency, Ministry of Energy
Project Cost
486,000,000 Baht
Project Period
2008 – 2009
Project decription
Construction of a concrete overflow dam in the style of Ogee (Ogee-shaped Concrete Spillway) 15 meters high, blocking the Mae Ngao River in Sop Khong Sub-district, Omkoi District, Chiang Mai Province and Mae Song Subdistrict Tha Song Yang District, Tak Province to generate electricity for use with a maximum design water storage volume of 130,000 cubic meters and divert water through the draw pipe to the power plant to generate electricity with a water turbine and generator. It has an installed power generation capacity of 2,100 kilowatts, producing 5.93 million units of electricity per year.
 
Service scope
- Plan, manage and prepare project development plans
- Feasibility study of engineering, financial and economics
- Initial Environmental Impact analysis (IEE)
- Prepare project publicity and public participation
- Study the initial options to determine the project components
- Feasibility study of the project
- Initial design, financial analysis, estimated project construction cost
- Prepare construction and investment plans